Office planning
Discovery, site walks, requirements, budgets, schedules, risk review, drawings, vendor coordination, and move sequencing.
FFT coordinates the technology, infrastructure, construction interfaces, move execution, and final cutover needed to deliver a ready-to-work office—with one accountable partner reducing gaps between trades and vendors.
A business relocation is not finished when the furniture arrives. Employees need internet, phones, computers, Wi-Fi, printing, access, conference rooms, cloud services, and the physical space behind them to be ready together.
FFT connects the planning conversations that are often separated among landlords, general contractors, electricians, HVAC teams, internet providers, movers, cabling contractors, security vendors, A/V integrators, and internal IT.
By owning the technology roadmap and coordinating the interfaces, we reduce missed scope, last-minute surprises, downtime, and finger-pointing.

Discovery, site walks, requirements, budgets, schedules, risk review, drawings, vendor coordination, and move sequencing.
Constructing or removing walls, lighting, electrical, and HVAC coordination or work where permitted by licensing, scope, and project requirements.
Structured copper cabling, fiber, pathways, racks, telecom rooms, patching, labeling, testing, Wi-Fi design, and internet readiness.
Access control, cameras, intrusion or other security systems where appropriate, coordinated with doors, power, network, policies, and authorized providers.
Displays, cameras, microphones, speakers, control, room scheduling, acoustics, cabling, and collaboration platform integration.
Inventory, labeling, packing coordination, relocation, setup, and reconnection of supported computers, phones, printers, network, and specialty equipment.
Internet cutover, phones, domains, cloud services, remote access, user accounts, shared resources, and vendor transitions.
System validation, room testing, user readiness, issue lists, employee support, documentation, and post-move stabilization.
FFT tracks these dependencies as part of one transition plan so responsibilities are clearer and decisions happen before walls close or move day arrives.
Business goals, headcount, workflows, equipment, vendors, lease milestones, constraints, budget, and downtime tolerance.
Space and technology requirements, infrastructure, room standards, device locations, security, A/V, and responsibilities.
Align walls, lighting, HVAC, power, pathways, millwork, doors, ceilings, and finish schedules with technology needs.
Install, terminate, label, and test supported copper, fiber, racks, Wi-Fi, telecom rooms, and related systems.
Inventory equipment, confirm internet and services, stage configurations, communicate user steps, and finalize cutover plans.
Coordinate the physical move, reconnect supported technology, activate services, and address priority dependencies.
Validate network, phones, computers, printing, access, conference rooms, A/V, cloud access, and employee workflows.
Resolve punch-list items, support users, refine configurations, update documentation, and stabilize the new environment.
This short overview shows how FFT helps connect planning, construction, infrastructure, technology, move execution, and employee readiness—so the new office is prepared to work as a complete system.
Early involvement protects flexibility, budget, and finish quality.
FFT helps architects, contractors, landlords, and business stakeholders identify technology requirements while they are still easy to accommodate. That includes pathways, cable types, equipment-room needs, display backing, speaker locations, access-control interfaces, network density, Wi-Fi placement, power, ventilation, and service access.
Where work requires a specific license, permit, inspection, or specialty trade, FFT coordinates responsibilities and performs work only within applicable licensing and project scope.

FFT identifies critical systems, dependencies, fallback options, vendor dates, testing steps, decision owners, and employee communication needs. We plan the sequence around what must be available first and what can safely follow.
No responsible partner can promise that every move is risk-free, but disciplined planning, clear accountability, staging, testing, and post-move support materially improve readiness.
From FFT’s Monrovia office, we support business technology projects in Southern California and other locations where project scope, scheduling, and coverage align.
Service-area availability varies by project. Contact FFT early so site visits, trade coordination, procurement, and move support can be evaluated alongside the lease and construction schedule.
As early as possible—ideally during site evaluation, lease planning, or early design. Technology decisions can affect walls, ceilings, doors, power, HVAC, millwork, furniture, and construction schedules.
FFT can serve as the accountable technology and project-coordination partner within the agreed scope, while working with required licensed trades, building management, carriers, vendors, and internal stakeholders.
Yes, supported technology can be inventoried, prepared, relocated, reconnected, configured, and tested as part of the move plan.
Timing depends on site condition, design, permits, construction, carrier lead times, procurement, cabling, system complexity, and move size. FFT builds a schedule after discovery rather than offering an unsupported generic promise.
Employee readiness is a primary goal. FFT plans and tests the systems required for work, but actual readiness depends on coordinated completion by all responsible parties and resolution of any exceptions.
Yes. Post-move assistance can cover user issues, punch-list items, configuration refinements, vendor follow-up, documentation, and ongoing managed or hourly IT support.
Share the current location, new site, target timing, and known construction or technology needs. FFT will help define the next planning step.