Fully Functional Technology has redone the network cabling for most of their medical clinics and we recently completed a complete network installation at their new Headquarters in Los Angeles, CA
Fully Functional Technology, Inc and Central Neighborhood Health Foundation have worked together for years as their primary network systems contractor. We have been upgrading their clinics from Cat5 networks to Cat6, one after another.
Recently CNHF acquired a new, expanded headquarters facility for their offices. The general contractor requested that we pull our own permits, install all of the conduit, and install the Cat6 data network.
- 2000ft of EMT Conduit (range 3/4in – 3in EMT)
- 40,000ft of Cat6 cable to over 200 drop locations
- New 2-Post Network Rack with Full Cable Management
- Ladder Racking & J-Hook System (approximately 500 J-Hooks in Concrete Ceilings)
- Fire-Rated Plywood and Fire-Rated Passthroughs in MDF Rack Room
- Cored Concrete Between 1st and 2nd Floors and Installed Fire-Rated Pass-Throughs
- Wired Network Cabling into Cubicles
- Labelled and Tested All Network Runs
- Provided Detailed Network Map